Skip to content
Hope CGI: Construction Documents | LiDAR Imaging
Menu

Commercial | New and existing buildings

Permit-ready plans for commercial buildings in Cochise County, new and existing.

Planning a tenant improvement, a change of use or a new building? An Arizona-registered design professional leads the project. We scan the building or site and prepare the plans under their direct supervision. We are your single point of contact, and you get a set your contractor can price. We work across Cochise County.

264 projects completed since 2018.

Concept rendering of a balcony retrofit on a brick building: curved steel brackets under the deck and a steel railing
Concept rendering of a balcony retrofit on a brick building, from the same model as the drawings.

Changing how a building is used?

A new use can change the occupancy classification and bring exit, fire separation and accessibility requirements with it. The design professional reviews those requirements, and we document them, before you sign a lease or start design.

Building new?

The design professional leads the design. We model the building and prepare the set under their supervision, with written specifications your contractor can bid from.

Altering an existing building?

We scan the building and draw what is there. The design professional sets what the alteration requires under the existing building code, and we prepare the plans to match.

Before: demolition

Tenant improvement floor plan with the demolition overlay: work to be removed in red dashed line over the new layout
Rose Tree Museum building, Tombstone, tenant improvement: we drew the demolition in red over the new layout, so the contractor sees what goes and what stays.

After: new layout

The same work area as new construction: four suites with their room areas, new walls, restrooms and doors
The same work area as new construction: Suites 3 to 6.

Select a drawing to open it full size.

Services

What goes into your plans.

North elevation of a restaurant building in Bisbee: a covered porch with posts and railings on a stone base, under a standing seam roof
North elevation we drew for a restaurant tenant improvement in Bisbee.

Permit-Ready Plans

A complete set for your building department's review.

What is included
  • Prepared under the supervision of the design professional
  • Plans, sections, project-specific details and schedules
  • Written specifications
  • Coordinated with the structural, civil, mechanical, electrical and plumbing engineers the scope requires
  • Plan review comments answered with the design professional, and the set revised for resubmittal
Emergency egress plan with travel paths, travel distances and exit signage marked
Egress plan we prepared: exit paths in green, with travel distances marked for plan review.

Building Code Analysis

Find out what a new use or an alteration requires before you commit.

What is included
  • Occupancy classification by actual use
  • Exit, occupant load and fire separation diagrams
  • Alteration level for existing buildings
  • Written summary with code sections cited, reviewed by the design professional
Existing conditions floor plan of a three-unit apartment building with gridlines, room names and door and window tags
Existing conditions floor plan of a three-unit apartment building, drawn from our laser scan. Select it to open full size.

LiDAR Existing Conditions

Design starts from measured conditions, not field estimates.

What is included
  • Laser scan of interiors, exterior and site
  • Registered point cloud and Revit model
  • Existing conditions drawings for the project team

Common questions

Who leads the project?

An Arizona-registered design professional leads the project. We work under their direct supervision: we scan, model and prepare the plans, and the design professional reviews and seals the work.

The design professional is an Arizona-registered engineer or architect. See For Architects.

Are the design professional's fees included?

Engineering and architects' fees are quoted separately, so you see what each part of your project costs.

Which codes do the plans follow?

The codes each jurisdiction has adopted. As of 2026, the City of Bisbee uses the 2024 IRC, IBC and IEBC and the 2023 NEC. Elsewhere the adopted editions are confirmed before design starts.

Request a Free Site Visit

Contractors and design professionals

Contractors and design-build teams: hire us directly; your engineer or architect leads. Call 520.236.1260.

Have a building in mind? Let's take a look.

Tell us the address, the use you plan and when you want to open. We reply within 1 business day with next steps.